The fee payer shall pay the Sewer Facilities Impact Fee required by the Newcastle Public Works Authority Sewer Facilities Impact Fee Regulation to the Clerk/Manager or his/her designee prior to connection to the Authority's sewer system. Each connection of a fee payer for an 8" water meter = $7,500.Each connection of a fee payer for a 6" water meter = $6,500.Each connection of a fee payer for a 4" water meter = $5,500. ![]() Each connection of a fee payer for a 3" water meter = $4,500.Each connection of a fee payer for a 1½" to 2" water meter = $3,500.Each connection of a fee payer for a 1" water meter = $3,000.Each connection of a fee payer for a ¾" water meter = $2,500.Sewer and Water Impact Fees Effective as of October 1, 2023: Connection Base Impact Fee Schedule for Sewer Facilities Connection Type (based upon size of the site's water meter) Recieve real-time e-mail notifications when an inspection is completed.Request inspections or temporary/permanent services online.View and print copies of documents recieved from city staff any time, including completed inspection reports.Track application progress, up to permit issuance. ![]() ( PDF help guide here) for assistance on how to pay for the issued contractor license regristration.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |